Fixing Poor Architecture and Design where use of Workshop "Date(s)" field is the only Selector of a Workshop is
Hi aXcelerate,
I raised this "problem" as a case but was told that it is designed to work this way and my suggestion should go into the ideas forum.
There seem to be numerous instances where the software provides only the information in the "Dates(s)" field as a way of telling one workshop from another.
One example is in the screen "Add Workshop to Class" (or in our case add Studio Session to Course).
Another is in grouping workshops for consolidated survey results.
One would think that it would be fairly easy to dipslay a composite of "Workshop Name" PLUS "Date(s)" field.
I'm not sure if my suggestion is clear - so let me know if I need to explain further.
Please sign in to leave a comment.
Comments
0 comments